The main parachute "Segment"
The main “Segment” parachute is a 7-section dome designed for acrobatics (rotation and rebuilding). The dome “Segment” is made of fabric with zero breathability (ZP, Gelvenor Textiles), equipped with slings…

Continue reading →

piss first
Skydiving canopy piloting
Dome Acrobatics (canopy RW, CRW, CReW) In this type of parachuting, athletes build various figures in the sky and perform rebuilding with an already opened parachute. At the same time,…

Continue reading →

Landing accuracy jumps
When performing individual jumps for accuracy of landing, the skydiver must: to conduct a rigorous analytical calculation of the separation point, control points, monitoring them on the ground by stopwatch…

Continue reading →

system

First Managed Planning Cargo Parachute Ready for Testing

To date, the Tekhnodinamika holding company, which is part of the Rostec state corporation, has manufactured and prepared for factory tests 7 prototypes (6-year-olds, 1 will pass the ground test program) of the UPGS-4000 guided planning parachute-cargo system for unloading cargo from an airplane IL-76. This was announced on January 10 by the Rostec press service. Continue reading

U-Turn Physics under the Dome (part 2)
You should begin training in high-speed landing by approaching in a straight line with acceleration by two front free ends, which must be pulled up by 10-12 cm.This approach will…

...

The new parachute system for the Airborne Forces successfully passed the first stage of state tests
Discharges of the new parachute system for armored vehicles (BTR) and airborne combat vehicles (BMD) “Bahcha-U-PDS” at the first stage of state testing were successful. This was reported in the…

...

The new parachute system for the Airborne Forces successfully passed the first stage of state tests
Discharges of the new parachute system for armored vehicles (BTR) and airborne combat vehicles (BMD) “Bahcha-U-PDS” at the first stage of state testing were successful. This was reported in the…

...