The main parachute "Segment"
The main “Segment” parachute is a 7-section dome designed for acrobatics (rotation and rebuilding). The dome “Segment” is made of fabric with zero breathability (ZP, Gelvenor Textiles), equipped with slings…

Continue reading →

An updated section of the metal production workshop of JSC Flight was opened in Ivanovo
In mid-May, the opening of a new high-tech galvanic section of the metal production workshop of the Ivanovo Parachute Plant “Polet” was launched as part of a technical re-equipment project.…

Continue reading →

Skydiving canopy piloting
Dome Acrobatics (canopy RW, CRW, CReW) In this type of parachuting, athletes build various figures in the sky and perform rebuilding with an already opened parachute. At the same time,…

Continue reading →

downloads

The main parachute “Sirocco” company “SKYLARK”

The rapid development of swoop forces manufacturers of parachute equipment to raise the level of technical excellence of their products. When developing this dome, almost all the comments of experienced swoopers that occurred when piloting parachutes of a similar class were taken into account.

Firstly, it is the inherent diagonal parachutes excessive rigidity during deployment. Continue reading

First Jump Preparation: Beginner Outfit
At first glance, a beginner expects a lot of difficulties in parachuting. In fact, everything is far from being as difficult as it seems. We will try to answer the…

...

The main parachute "Sirocco" company "SKYLARK"
The rapid development of swoop forces manufacturers of parachute equipment to raise the level of technical excellence of their products. When developing this dome, almost all the comments of experienced…

...

Performing a set of figures in free fall
For a clear and safe execution of the complex of figures, the paratrooper must: On the ground: develop a detailed jump model; firmly master your actions at every second of…

...

U-Turn Physics under the Dome (part 2)
You should begin training in high-speed landing by approaching in a straight line with acceleration by two front free ends, which must be pulled up by 10-12 cm.This approach will…

...