Beginner Tips - Low U-Turn (part 3)
Acceleration using the front free ends has a number of important advantages compared to turning the brakes. Acceleration with the help of the front free ends accelerates the dome, and…

Continue reading →

First Managed Planning Cargo Parachute Ready for Testing
To date, the Tekhnodinamika holding company, which is part of the Rostec state corporation, has manufactured and prepared for factory tests 7 prototypes (6-year-olds, 1 will pass the ground test…

Continue reading →

GVA officers are studying in the Ryazan center of the airborne airborne parachute system "Crossbow-1" and "Crossbow-2"
More than 100 officers and instructors of the airborne service from all formations of the Russian Airborne Forces take part in a training camp for the study and practical development…

Continue reading →

details

7-section precision parachute Malva-24SK

Appointment
The parachute sports system “Malva-24SK” is designed to perform all types of jumps both by individual athletes – paratroopers, and groups of parachutists from airplanes and helicopters designed to perform parachute jumps, when it is put into operation immediately after separation from the aircraft or with a delay of opening valve knapsacks. Continue reading

The parachute braking system for the T-50 aircraft confirmed the characteristics during the tests
During the flight tests of the 5th generation fighter T-50, the Sukhoi company checked the parachute braking system created for this aircraft, Dmitry Tretyakov, Director General of the Parachute Research…

...

The main parachute "Accurate"
The main Accurate parachute is a 7-section canopy, of a classic rectangular shape, designed for jumping on landing accuracy. The prototype for the creation of this dome was the famous…

...

An updated section of the metal production workshop of JSC Flight was opened in Ivanovo
In mid-May, the opening of a new high-tech galvanic section of the metal production workshop of the Ivanovo Parachute Plant “Polet” was launched as part of a technical re-equipment project.…

...

U-Turn Physics under the Dome (part 2)
You should begin training in high-speed landing by approaching in a straight line with acceleration by two front free ends, which must be pulled up by 10-12 cm.This approach will…

...